| All the buildings and railway items are based on prototypes
from locations local to the area. Track is mainly ply and rivet with
plastic chairs.
The layout is still under construction, with the track and electrics
complete and tested and scenery and buildings under way.
The group also meet on Sunday mornings from 09-30 to 12-30 to build and
operate.
If you're interested in joining the group contract us via the SHMRC. |